A usual source of confusion: which LCG_Util version requires which GFAL library version. Almost after each release somebody installed the wrong packages somewhere. Now, the confusion is over: from the next release on, we always release those two components together, under the same version numbers (but with different tag prefix, certainly). We will create the first such a release pair this week, with version numbers 1.11.12-1 (the next GFAL version number). It means, that there will be a gap in LCG_Util case: version 1.7.8-1 will jump up to 1.11.2-1. Keep tuned.
Thursday, November 19, 2009
Wednesday, November 4, 2009
Debugging tricks
When you want to debug the command-line tools of the projects, you find immediately that the commands are in fact shell scripts. They are libtool wrapper files actually and set up several things before calling the binaries themselves. You need to invoke gdb in the following way:
libtool gdb _command_
From this point, everything should work as usual.
Next, you may run into the following trouble when debugging:
lcg_del_LDADD = $(COMMON_LIBS) -lpthread
Good luck!
libtool gdb _command_
From this point, everything should work as usual.
Next, you may run into the following trouble when debugging:
[Thread debugging using libthread_db enabled]For me, it occured on SLC5, when the code used the dynamic linking library (dlopen, etc.). You can eliminate the problem by linking libpthread directly to your executable. For example:
Error while reading shared library symbols:
Cannot find new threads: generic error
lcg_del_LDADD = $(COMMON_LIBS) -lpthread
Good luck!
Tuesday, November 3, 2009
GFAL and LCG_Util test bed developments
Currently, the GFAL test suite contains integration and regression tests only. The certification process develops and executes those tests. We need something more and flexible: basically, we need unit/white box tests that checks GFAL code validity until the boundaries of its dependencies. We started to create unit test suite for both GFAL and LCG_Util, for debugging and internal validation purposes. The unit test suite requires some redesign for the code (redesign for testability). The pattern behind is dependency injection. The code covered by unit tests will never call external library code directly (except for the standard C library functions), they will do it by replaceable function pointers. In production, the pointers point to the original functions, however, a white-box test can replace a set of functions for dummy ones simulating a scenario.
We do not change the whole GFAL code, to avoid regression. We change the code gradually as we solve the Savannah tasks. All the appropriate Savannah tasks will go with unit tests as well, and only the code affected by a task will be changed. What we will get is a "hybrid": in some cases, functions will be called directly, in some cases indirectly. In ideal case, we reach full unit test coverage when the function call methods get unified.
We will demonstrate the power of the unit test suite with solving RFE: Extra parameter in lcg-cp for a better TURL construction.
After unit tests, we have to have a controllable regression/integration test suite. As we cannot control the certification test bed and it is tightly bound to the certification test environment, we create our own test bed better integrated into the development environemnt. We do it by copying the cert. tests into our source tree, adapting to our environment, then we start adding tests covering our tasks and purposes.
We do not change the whole GFAL code, to avoid regression. We change the code gradually as we solve the Savannah tasks. All the appropriate Savannah tasks will go with unit tests as well, and only the code affected by a task will be changed. What we will get is a "hybrid": in some cases, functions will be called directly, in some cases indirectly. In ideal case, we reach full unit test coverage when the function call methods get unified.
We will demonstrate the power of the unit test suite with solving RFE: Extra parameter in lcg-cp for a better TURL construction.
After unit tests, we have to have a controllable regression/integration test suite. As we cannot control the certification test bed and it is tightly bound to the certification test environment, we create our own test bed better integrated into the development environemnt. We do it by copying the cert. tests into our source tree, adapting to our environment, then we start adding tests covering our tasks and purposes.